Non classé

Evening of fine tuning at 1 month from the Church of Our Lady of Laeken’s final lighting

The designer Fiorenzo, supervising the settings
A tight collaboration of expetises – between the designer and the technician
A high lift manoevre from the Notre-Dame square
End of the evening’s operations with the core crew

Previous post

Landschapsverlichting voor het Nautilus-project

Next post

This is the most recent story.